Depending on the results of the initial
investigation of the survey of any project it is then expanded to a more detailed feasibility study.
“FEASIBILITY STUDY” is a test of system proposal according to its workability,
impact of the organization, ability to meet needs and effective use of the resources.
It focuses on these major questions:
·
What are the user’s demonstrable needs and
how does a candidate system meet them?
·
What resources are available for given
candidate system?
·
What are the likely impacts of the
candidate system on the organization?
·
Whether it is worth to solve the problem?
During
feasibility analysis for this project, following primary areas of interest are
to be considered. Investigation and generating ideas about a new system does
this.
Steps in feasibility analysis:
Eight steps involved in the feasibility
analysis are:
·
Form a project team and appoint a project
leader.
·
Prepare system flowcharts.
·
Enumerate potential proposed system.
· Weight system performance and cost data.
·
Select the best-proposed system.
·
Prepare and report final project directive
to management.
1. Technical Feasibility
It
is a study of resource availability that may affect the ability to achieve an
acceptable system. This evaluation determines whether the technology needed for
the proposed system is available or not.
·
Can the work for the project be done with
current equipment existing software technology & available personal?
·
Can the system be upgraded if developed?
·
If new technology is needed then what can
be developed?
·
This is concerned with specifying
equipment and software that will successfully satisfy the user requirement. The
technical needs of the system may include:
·
Front-end and back-end selection
An important issue for the development of
a project is the selection of suitable front-end and back-end. When we decided
to develop the project we went through an extensive study to determine the most
suitable platform that suits the needs of the organization as well as helps in
development of the project.
The aspects of our study included the
following factors:
Front-end selection:
It must have a GUI that assists employees
that are not from IT background.
·
Scalability and extensibility
·
Flexibility
·
Robustness
According to the organization requirement
and the culture
·
Must provide excellent reporting features
with good printing support
·
Platform independent
·
Easy to debug and maintain
·
Event driven programming facility
·
Front end must support some popular back
end like MS Access
2.
Economic Feasibility
Economic justification is generally the
“Bottom Line” consideration for most systems. Economic justification includes a
broad range of concerns that includes cost benefit analysis. In this we weight
the cost and the benefits associated with the candidate system and if it suits
the basic purpose of the organization i.e. profit making, the project is making
to the analysis and design phase.
The financial and the economic questions
during the preliminary investigation are verified to estimate the following:
·
The cost to conduct a full system
investigation.
·
The cost of hardware and software for the
class of application being considered.
·
The benefits in the form of reduced cost.
·
The proposed system will give the minute
information, as a result the Performance is improved
This feasibility checks whether the system
can be developed with the available funds. Online Bookstore System does not
require enormous amount of money to be in function. This can be done
economically if planned judicially, so it is economically feasible. The cost of
project depends upon the number of man-hours required.
3.
Operational Feasibility
It is mainly related to human organizations
and political aspects. The points to be considered are:
·
What changes will be brought with the
system?
·
What organization structures are
disturbed?
·
What new skills will be required? Do the
existing staff members have these skills? If not, can they be trained in due
course of time?
The system is operationally feasible as it
very easy for the End users to operate it. It only demands some basic
information about Windows platform.
4.
Schedule Feasibility
Time evaluation is the most important
consideration in the development of project. The time schedule required for the
developed of this project is very important since more development time effect
machine time, cost and cause delay in the development of other systems. A
reliable online billing System can be developed in the considerable amount of
time.
No comments:
Post a Comment